SCE designed and manufactured five Crucible Tilters for an aluminium smelter in the Middle East.
Overview
SCE supplied five Crucible Tilters within a very short lead time. They were completed, fully tested, on time and within budget.
The contract, worth $1.4M was awarded as a result of our previous association with the aluminium smelting industry, having manufactured plant, including special heavy duty cranes successfully over the years.
SCE project managed all design, including pneumatics, in-house design of electrical / electronics and hydraulic controls and actuation.
Raise / lower function via hydraulic sylinders with pumps driven via a pneumatic motor. Remote radio control of all functions.
By constantly seeking improvement we can push the performance of our designs to new levels.
Ensure production is maintained with a sound spare parts programme.
Our facilities can handle from the small to full plant design and manufacture.